Standard Uranium offers high-grade uranium discovery potential in the Athabasca Basin. With a fully funded drill program scheduled for spring 2026 at its flagship Davidson River project, and joint ventures on other highly prospective projects, the company provides investors early stage exposure to the emerging nuclear energy market.

Overview

Standard Uranium (TSXV:STND,USOTC:STTDF,FRA:9SU0) is a uranium exploration and project generation company focused on advancing high-grade uranium discoveries within the world-famous Athabasca Basin in Saskatchewan, Canada.

With a mission to “supply the fuel for a clean energy future,” Standard Uranium is focused on discovering and developing basement-hosted and unconformity-related uranium deposits that can power the growth of nuclear energy. Its dual-track model combines aggressive exploration at its flagship Davidson River project with a robust project generator platform, advancing multiple projects through partnerships while generating non-dilutive cash flow in operator fees, share payments, and royalties.

With 13 projects totaling more than 235,000 acres, Standard Uranium offers investors exposure to both immediate discovery catalysts and long-term portfolio value. Its leadership team brings deep geological expertise and operational experience across the Athabasca Basin, complemented by disciplined capital management.

As global governments reaffirm nuclear energy’s role in achieving net-zero targets, Standard Uranium is positioned to capitalize on the growing demand for secure, high-grade uranium supply from Canada.

Company Highlights

  • Flagship Davidson River Project: Large-scale, high-priority exploration asset in the southwest Athabasca Basin, along trend from NexGen’s Arrow and Paladin Energy’s Triple R uranium deposits, positioned for a significant uranium discovery.
  • Extensive Portfolio in the Athabasca Basin: Over 235,000 acres (95,000+ hectares) across 13 projects in Canada’s premier uranium district, including active joint ventures at Sun Dog, Corvo, and Rocas.
  • Project Generator Model: Leverages strategic partnerships to fund exploration and generate cash flow while retaining upside through 25 percent ownership and a 2.5 percent net smelter return (NSR) royalty on joint-venture projects.
  • Fully Funded for Davidson River Drill Campaign: Financing completed to support 8,000 to 10,000 meters of drilling at Davidson River, planned for spring 2026.
  • Rocas Drill Program: The first-ever drill program to be conducted on Rocas will commence in winter 2026, comprising approximately 1,800 metres.
  • Corvo Drill Program: A skid-assisted diamond drill program totalling approximately 3,000 metres is planned for winter 2026, which will mark the first drill program on the Project in more than 40 years.
  • Riding the Nuclear Power Renaissance: Positioned to benefit from global decarbonization trends and a long-term rise in uranium demand.
  • Proven Team: Led by experienced geologists and exploration professionals with a track record of discoveries in the Athabasca Basin.

Key Projects

Davidson River Project

Located in the southwest Athabasca Basin, approximately 25 kilometres west of NexGen’s Arrow deposit and Paladin Energy’s Triple R deposit, the Davidson River project spans 30,737 hectares across 10 contiguous mineral claims. The property lies along the same structural trends that hosts these globally significant discoveries.

To date, Standard Uranium has drilled 16,561 metres across 39 holes, intersecting wide, graphitic-sulphidic shear zones, structural deformation, and alteration features characteristic of high-grade basement uranium systems. Recent multiphysics and machine learning-assisted surveys conducted in partnership with Fleet Space Technologies and GoldSpot Discoveries have provided new three-dimensional imaging of subsurface structures, identifying refined targets along the Warrior, Bronco and Thunderbird corridors.

The company is preparing for an 8,000 to 10,000-meter diamond drill campaign scheduled for spring 2026, marking its most comprehensive program to date. With modern targeting data and strong geological indicators, Davidson River represents the company’s clearest path to a transformational discovery in the southwest Athabasca Basin.

Sun Dog Project (JV)

Located in the northwestern Athabasca Basin near Uranium City, the Sun Dog project consists of nine mineral claims totaling 19,603 hectares. This highly prospective property sits in a historically productive uranium district that remains underexplored by modern methods.

Surface sampling has identified several uranium-rich showings, including modern grab samples returning grades up to 3.58 percent U₃O₈. The project’s targets are associated with structural intersections and alteration zones consistent with basement-hosted and unconformity-related uranium systems.

Standard Uranium has partnered with Aero Energy, under a three-year earn-in agreement, allowing Aero to acquire up to a 100 percent interest in the project. The partnership structure ensures ongoing advancement at Sun Dog with Standard Uranium retaining a 2.5 percent NSR royalty, providing continued exposure to discovery success without direct funding requirements.

Corvo Project (JV)

The Corvo project in the eastern Athabasca Basin covers 12,265 hectares and represents one of Standard Uranium’s most promising partner-funded assets. The project lies along three major magnetic low and EM conductor trends extending for nearly 29 kilometres of prospective strike length.

The project is currently being advanced under a joint venture with Aventis Energy, which is funding exploration work through a three-year earn-in agreement. Standard retains a 25 percent ownership interest and a 2.5 percent NSR, while acting as operator during the earn-in phase.

Historical drilling and sampling have confirmed uranium mineralization, including the “Manhattan” showing, where modern surface grab samples collected by the company in 2025 returned assays up to 8.10 percent U3O8. These results highlight the property’s potential to host near-surface, high-grade uranium deposits.

Rocas Project (JV)

The Rocas project, located in the southeastern Athabasca Basin region, lies approximately 75 km southwest of the Key Lake mine and mill and covers 4,002 hectares along a 7.5-km northeast-trending magnetic low and EM conductor corridor.

Surface exploration has confirmed uranium mineralization at outcrop, with historical grab samples grading up to 0.5 percent U₃O₈ across nearly 900 metres of strike length. Historical surveys have also identified lakebed geochemical anomalies and structural features that indicate potential zones of hydrothermal alteration, ideal settings for basement-hosted uranium deposits.

In 2025, Standard Uranium executed an option agreement with Collective Metals, granting the partner 75 percent earn-in over three years in exchange for staged cash payments, share issuances, and $4.5 million in exploration spending. Standard retains a 25 percent ownership interest and a 2.5 percent NSR, while acting as operator during the earn-in phase.

Eastern Athabasca Exploration Projects

Beyond its flagship and joint-venture assets, Standard Uranium holds eight additional exploration-stage properties across the eastern Athabasca Basin, including Ascent, Canary, Atlantic, Cable Bay, Ox Lake, Umbra, Brown Lake and Sable. Together, these projects cover over 43,000 hectares of highly prospective ground along established uranium trends near recent discoveries by Denison Mines and IsoEnergy.

These projects represent the company’s pipeline of future partnerships and discovery opportunities, ensuring consistent exploration activity across the Basin.

Management Team

Jon Bey – Chairman, CEO, and Director

Jon Bey is a capital markets executive with over two decades of experience in the junior exploration industry. Bey has explored for uranium, gold, silver, diamonds and oil and gas in the Americas, Europe, Asia and Africa. He has public company experience across several sectors and with companies listed on the TSX, TSXV, CSE and LSE exchanges. Bey is the chairman of Ophir Metals and the founder and managing director of the Steel Rose Group of companies.

Sean Hillacre – President & VP Exploration

Sean Hillacre has over a decade of experience as an economic geologist in the Athabasca Basin uranium district, including five years at NexGen Energy as part of the technical team progressing the Arrow uranium deposit toward production. A high-energy, results oriented geoscientist, Hillacre brings a unique and balanced background integrating academic geoscience with industry experience, along with a comprehensive understanding of project development.

Vivien Chang – Chief Financial Officer

Vivien Chuang is a chartered professional accountant (BC, Canada) with more than 15 years of experience in the resource and mining sector. She was a former CFO of Azincourt Energy, BluEnergies, Muzhu Mining, and Northern Empire Resources, K2 Gold Corporation and Chakana Copper (formerly Remo Resources). Currently, she is VP Finance of Jasper Management and Advisory and president of VC Consulting, which provides CFO and other financial accounting and compliance services to a number of companies.

Neil McCallum – Lead Technical Director

Neil McCallum has over 15 years of experience primarily in North American mineral deposit exploration, with a focus on targeting and discovery of unconformity-related uranium deposits. He is currently a project manager at Edmonton-based Dahrouge Geological Consulting. McCallum has managed and conducted uranium exploration in and around the Athabasca Basin and other jurisdictions for multiple companies.

This post appeared first on investingnews.com

The world’s top gold producers delivered a string of robust second-quarter results, buoyed by record prices and resilient operations as investors continue to seek refuge in the yellow metal amid growing economic uncertainty.

With spot gold trading above US$3,400 per troy ounce, just shy of its April all-time high of US$3,448.50, the world’s largest gold producers posted higher earnings and stronger cash flow in their recent Q2 results.

Below is a breakdown of how a few major players fared in Q2.

Barrick nearly doubles profit margins

Barrick Mining (TSX:ABX,NYSE:B) formerly Barrick Gold, reported a 97 percent year-on-year jump in net income to US$1.25 billion for the quarter, compared to US$634 million a year earlier.

Earnings per share rose to US$0.47 while operating cash flow in the first half reached US$2.5 billion, up 32 percent from 2024. Free cash flow more than doubled to US$770 million, supported by higher commodity prices.

Gold production climbed 5 percent from the first quarter, while copper output surged 34 percent, led by strong performance at Zambia’s Lumwana mine. Nevada Gold Mines boosted output by 11 percent, while Pueblo Viejo in the Dominican Republic posted a 28 percent increase as expansion work in the site advanced.

“From the ramp-up at Goldrush to the progress at Pueblo Viejo, Lumwana and Reko Diq, not to mention the transformational potential of Fourmile, we’re demonstrating the strength and depth of our portfolio,” president and chief executive Mark Bristow said in the recent Q2 report.

The company also recently agreed to sell its Alturas Project in Chile to a Boroo subsidiary for US$50 million upfront plus a royalty, with proceeds earmarked for funding future ventures

Kinross outpaces gold price gains

Kinross Gold Corporation (TSX:K,NYSE:KGC) posted record attributable free cash flow of US$646.6 million in the second quarter, alongside operating cash flow of US$992.4 million. Adjusted net earnings jumped to US$541 million from US$174.7 million a year earlier.

Further, the company achieved a 21 percent margin increase from the first quarter, outpacing the 15 percent rise in gold prices over the same period.

“Our portfolio of mines continued to perform well during the quarter contributing to a strong first half of the year and positioning us well to achieve our full-year guidance,” CEO J. Paul Rollinson said.

Kinross said that it expects to produce 2 million gold-equivalent ounces in 2025 at an average production cost of US$1,120 per ounce.

Paracatu in Brazil was the company’s top-producing asset, while Tasiast in Mauritania began mining the Fennec satellite deposit. US-based Bald Mountain also reported higher output at lower costs.

The company also advanced key projects, including its Great Bear exploration program in Ontario, engineering work at Round Mountain Phase X in Nevada, and drilling at the Curlew Basin project in Washington.

Agnico Eagle delivers, shares gain

Agnico Eagle’s (TSX:AEM,NYSE:AEM) operational consistency and cost control helped drive a six-day share price rally, culminating in a 10.06 percent gain over the past week.

In the second quarter, the company produced 866,029 ounces of gold, maintaining full-year guidance of 3.3 to 3.5 million ounces. Adjusted earnings per share came in at US$1.94, prompting analysts to raise 2025 profit forecasts by US$0.70 to US$6.94.

Analysts cited the company’s steady performance despite rising unit costs, noting its appeal as a defensive play in the sector. Bank of America raised its price target to US$173 due to rising optimism about the firm’s growth prospects.

Newmont rides sector momentum

Newmont (TSX:NGT,NYSE:NEM) posted higher sales and net income for the quarter while authorizing a new share repurchase program and declaring a quarterly dividend.

The miner also renewed a key lease in Ghana. Shares rose 36 percent over the last quarter, outpacing the US Metals and Mining industry’s 24.1 percent return.

The performance came despite a drop in the company’s gold production. Rather, Newmont underscored the role of shareholder returns and strategic asset moves in supporting investor sentiment. Over the past three years, Newmont has delivered a total shareholder return of 63.75 percent.

Gold outlook: Gold shines during volatility

The sector’s strong quarter unfolded against a favorable macro backdrop.

Gold, which has gained about 30 percent year-to-date, has been buoyed by safe-haven flows. The metal’s latest rally began after spot prices dipped to US$3,311.80 in early August, then climbed back above US$3,418 by the first week of August..

The Federal Reserve cut rates by a full percentage point in late 2024 but has held steady this year, citing the need for more data on how tariffs affect inflation. Lower rates generally enhance gold’s appeal by reducing the opportunity cost of holding non-yielding assets..

Securities Disclosure: I, Giann Liguid, hold no direct investment interest in any company mentioned in this article.

This post appeared first on investingnews.com

Elliott Investment Management has reportedly taken a large stake in Barrick Mining (TSX:ABX,NYSE:B), the Financial Times reported on Tuesday (November 18), adding activist pressure to the gold producer, which is already dealing with escalating operational problems and a leadership shakeup.

The moves comes just weeks after the abrupt September exit of former CEO Mark Bristow, and as Barrick’s new chief executive, Mark Hill, begins overhauling the company’s regional structure.

In an internal memo seen by Bloomberg, Hill said Barrick will fold its Pueblo Viejo mine in the Dominican Republic into its North American division and merge its Latin America and Asia Pacific operations to improve performance.

Elliott’s investment also comes during a challenging phase for Barrick.

The company has been hit by rising costs at key North American assets and the loss of its most profitable operation, the Loulo-Gounkoto mine in Mali, after the military junta seized control earlier this year.

The dispute, which was tied to Mali’s new mining tax code, resulted in 3 metric tons of gold being taken by the state and the detention of four Barrick employees. The asset loss also triggered a roughly US$1 billion writeoff.

The setbacks have left Barrick trailing behind its peers despite a powerful gold price rally. Company shares are up 117 percent in the past year, compared with an average 130 percent gain among major rivals.

Barrick’s performance has company executives weighing their options.

As mentioned, a split into two companies is being considered. Four people told Reuters that this could involve one firm focused on North America and another holding assets in Africa and Asia. Another option would involve selling Barrick’s Africa portfolio outright, along with the Reko Diq project in Pakistan once financing is secured.

Barrick is also trying to resolve its dispute with Mali before pursuing a sale of that operation.

Investors have pushed similar ideas before, but were stifled due to the company’s North American footprint.

The company’s core US asset is Nevada Gold Mines, which it operates in partnership with Newmont (NYSE:NEM,ASX:NEM), and the sentiment has been that “there is not much of value” in Barrick’s remaining mines.

Bloomberg reported last month that Newmont was looking at whether a transaction could give it control of the Nevada operations it shares with Barrick, but discussions have not advanced since then.

Elliott, meanwhile, has a long record of targeting miners, including Anglo American (LSE:AAL,OTCQX:AAUKF) and Kinross Gold (TSX:K,NYSE:KGC), and often pushes for structural changes.

For Barrick, the challenge now is stabilizing its operations, while deciding how far to go with strategic restructuring in today’s historically high gold price environment.

Securities Disclosure: I, Giann Liguid, hold no direct investment interest in any company mentioned in this article.

This post appeared first on investingnews.com

Allied Critical Metals Inc. (CSE: ACM,OTC:ACMIF) (OTCQB: ACMIF) (FSE: 0VJ0) (‘Allied’ or the ‘Company’) is pleased to announce it has closed the first tranche (the ‘First Tranche’) of the previously announced non-brokered private placement offering (the ‘Offering’) of 14,996,986 units of the Company (the ‘Units’ and, each, a ‘Unit’) at a price of $0.30 per Unit raising gross proceeds $4,499,095.80. Each Unit will be comprised of one common share of the Company (a ‘Share’) and one-half of one common share purchase warrant (each whole common share purchase warrant, a ‘Warrant’). Each Warrant will entitle the holder thereof to acquire one additional Share (each a ‘Warrant Share’) at a price of $0.40 per Warrant Share and will be exercisable for a period of 24 months from the date of issuance.

The Company further announces that it has increased the size of the Offering to raise combined gross proceeds (including the First Tranche) of up to $5,000,000 in aggregate. The Company expects to close a final tranche of the Offering on or about August 18, 2025 (the ‘Final Tranche‘).

The Company intends to use the net proceeds of the Offering for ongoing exploration and development activities on the Borralha Tungsten Project and Vila Verde Tungsten Project and for additional working capital.

The Offering is subject to approval of the Canadian Securities Exchange (the ‘CSE‘), and all Units and securities of the Company issued pursuant to the Offering will be subject to a four month hold period from the date of issuance. The Offering will not result in the creation of a new insider or control person of the Company.

The Company paid finder’s fees of $310,386.30 in cash and 1,034,621 Finders Warrants (as defined below) in connection with the First Tranche of the Offering to eligible finders in accordance with policies of the CSE and applicable securities laws comprised of (i) a cash commission of up to 7% of the gross proceeds of the First Tranche, and (ii) a number of finders warrants (‘Finders Warrants‘), equal to up to 7% of the number of Units issued under the Offering with each Finders Warrant exercisable for one additional Unit of the Company for a period of 24 months at $0.30 per Unit from the date of issuance.

The Company may also pay finder’s fees in connection with the Final Tranche of the Offering to eligible finders in accordance with policies of the CSE and applicable securities laws consisting of (i) a cash commission of up to 7% of the gross proceeds of the Final Tranche, and (ii) a number of Finders Warrants equal to up to 7% of the number of Units issued under the Final Tranche.

This press release shall not constitute an offer to sell or the solicitation of an offer to buy securities in the United States, nor shall there be any sale of the securities in any jurisdiction in which such offer, solicitation or sale would be unlawful. The securities being offered have not been, nor will they be, registered under the 1933 Act or under any U.S. state securities laws, and may not be offered or sold in the United States absent registration or an applicable exemption from the registration requirements of the 1933 Act, as amended, and applicable state securities laws.

About Allied Critical Metals Inc.

Allied Critical Metals Inc. (CSE: ACM,OTC:ACMIF) (OTCQB: ACMIF) (FSE: 0VJ0) is a Canadian-based mining company focused on the expansion and revitalization of its 100% owned past producing Borralha Tungsten Project and the Vila Verde Tungsten Project in northern Portugal. Tungsten has been designated a critical metal by the United States and other western countries, as they are aggressively seeking friendly sources of this unique metal. Currently, China, Russia and North Korea represent approximately 86% of the total global supply and reserves. The tungsten market is estimated to be valued at approximately USD $5 to $6 billion and it is used in a variety of industries such as defense, automotive, manufacturing, electronics, and energy.

Please visit our website at www.alliedcritical.com.

Also visit us at:

LinkedIn: https://www.linkedin.com/company/allied-critical-metals-inc
X: https://x.com/@alliedcritical/
Instagram: https://www.instagram.com/alliedcriticalmetals/

ON BEHALF OF THE BOARD OF DIRECTORS

Per: ‘Roy Bonnell’

Roy Bonnell
Chief Executive Officer and Director

Contact Information

For further information or investor relations inquiries, please contact:
Dave Burwell, Vice President, Corporate Development
Tel: 403 410 7907 | Toll Free: 1-888-221-0915
Email: daveb@alliedcritical.com

The Canadian Stock Exchange does not accept responsibility for the adequacy or accuracy of this release.

Cautionary Statement Regarding Forward-Looking Information

This news release contains ‘forward-looking statements’, including with respect to the use of proceeds. Wherever possible, words such as ‘may’, ‘would’, ‘could’, ‘should’, ‘will’, ‘anticipate’, ‘believe’, ‘plan’, ‘expect’, ‘intend’, ‘estimate’, ‘potential for’ and similar expressions have been used to identify these forward-looking statements. These forward-looking statements reflect the current expectations of the Company’s management for future growth, results of operations, performance and business prospects and opportunities and involve significant known and unknown risks, uncertainties and assumptions, including, without limitation, those listed in the Company’s Listing Statement and other filings made by the Company with the Canadian securities regulatory authorities (which may be viewed under the Company’s profile at www.sedarplus.ca). Examples of forward-looking statements in this news release include, but are not limited to, statements regarding the proposed timeline and use of proceeds for exploration and development of the Company’s mineral projects as described in the Company’s Listing Statement, news releases, and corporate presentations. Should one or more of these risks or uncertainties materialize or should assumptions underlying the forward-looking statements prove incorrect, actual results, performance or achievements may vary materially from those expressed or implied by the forward-looking statements contained in this news release. These factors should be considered carefully, and prospective investors should not place undue reliance on the forward-looking statements. This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements and reference should also be made to the Company’s Listing Statement dated April 23, 2025 and news release dated May 16, 2025, and the documents incorporated by reference therein, filed under its SEDAR+ profile at www.sedarplus.ca for a description of additional risk factors. The Company disclaims any intention or obligation to revise forward-looking statements whether as a result of new information, future developments or otherwise, except as required by law.

Not for distribution to U.S. news wire services or dissemination in the United States

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/262558

News Provided by Newsfile via QuoteMedia

This post appeared first on investingnews.com

GMV Minerals Inc. (the ‘Company’ or ‘GMV’) (TSXV:GMV)(OTCQB:GMVMF) is pleased to announce positive results from the updated Preliminary Economic Assessment (‘PEA’) study of the Mexican Hat Gold Project (the ‘Mexican Hat Project’), located in Cochise County, southeastern Arizona.

A National Instrument 43-101 –Standards of Disclosure for Mineral Projects (‘NI 43-101’) compliant technical report (the ‘Report’) entitled ‘Updated NI 43-101 Technical Report Preliminary Economic Assessment, Mexican Hat Project’ with an effective date of August 8, 2025 will be filed on SEDAR+ at www.sedarplus.ca under the Company’s profile within 45 days of this news release. All amounts are stated in second quarter 2025 US dollars (US$).

The Mexican Hat hosts a shallow oxide gold resource with excellent metallurgy and high recoveries, supported by a low strip ratio and minimal pre-stripping. Infrastructure is in place and the Mexican Hat Project demonstrates a robust NPV and IRR. With fast leach kinetics and low reagent consumption, the Company believes the Mexican Hat Project offers exceptional potential economics.

Highlights:

    • Based on price sensitivity analysis at approximately the current price of US$3,350 per ounce of gold, the project returns a pre-tax IRR of 106.8% (after-tax 82.5%) and a pre-tax NPV at a 5% discount rate of US$767 million (after-tax US$538.1 million) with a payback period of 1.10 years (1.3 years after-tax).
    • Base Case mine life of 10 years with total production of 597,841 ounces, averaging approximately 60,000 ounces per year.
    • Crushed mineralized material will be conveyor stacked at a rate of approximately 10,000 tonnes/day on a conventional heap leach pad.
    • Capex: US$89,997,000 (including US$15.4 million contingency).
    • Opex: US$788 million LOM with Low LOM Strip Ratio of 2.05
    • Estimated cash cost of production is US$1,354 per ounce with an all-in-sustaining cost of $1,545 per ounce inclusive of sustaining capital and additional overhead support.
    • Engineering design analysis indicates the potential to increase pit size and contained ounces with increased gold prices.

    FINANCIAL INDICATORS

    The following table summarizes the financial indicators for the Mexican Hat Project for both before and after taxes.

    Financial Indicators Before Taxes

    Values

    NPV cash flow (undiscounted)

    US$537.7M

    NPV @ 5%

    US$390.2M

    IRR %

    66.1%

    Payback (years)

    1.53

    Financial Indicators After Taxes

    Values

    NPV cash flow (undiscounted)

    US$377.9M

    NPV @ 5%

    US$268.3M

    IRR %

    50.2%

    Payback (years)

    1.82

    GOLD PRICE SENSITIVITY TABLE (US$ MILLIONS)

    The following table summarizes the pre-tax and post-tax economic results to gold price sensitivity.

    Pre-Tax and Post-Tax Sensitivity to Gold Price

    -60%

    -45%

    -30%

    -15%

    Base

    +15%

    +34%

    +45%

    +60%

    US$/troy oz Gold

    1,000

    1,375

    1,750

    2,125

    2,500

    2,875

    3,350

    3,625

    4,000

    IRR (Pre-Tax)

    18.3%

    45.0%

    66.1%

    85.0%

    106.8%

    118.7%

    134.2%

    NPV @ 5% (Pre-Tax) US$M

    -274.7

    -108.5

    57.7

    224.0

    390.2

    556.4

    767.0

    888.9

    1,055.1

    IRR (Post-Tax)

    11.3%

    33.4%

    50.2%

    65.2%

    82.5%

    91.9%

    104.2%

    NPV @ 5% (Post-Tax) US$M

    -274.9

    -117.3

    25.8

    149.3

    268.3

    387.4

    538.1

    625.4

    744.4

    INITIAL CAPITAL EXPENDITURES (US$ MILLIONS)

    Initial capital expenditures are estimated at US$89,997,000 million as detailed below:

    OPERATING COSTS

    The mine operating costs were calculated to average $3.49 per tonne mined as summarized below.

    Mine Operating Cost Center

    Unit Cost (US$/t mined)

    Owner Mining Personnel

    $0.11

    Owner Supplies & Misc.

    0.03

    Contractor Mining

    3.35

    Total Cost (Rounded)

    $3.49

    The life-of-mine operating costs were calculated to average US$20.44/tonne resource processed as summarized below.

    Operating Cost

    Cost per Tonne of Crushed Material Processed (US$/t)

    Mining

    $10.60

    Processing

    $8.79

    G&A

    $1.05

    Total Site Operating Cost

    $20.44

    MINERAL RESOURCES

    An updated Mineral Resource Estimate prepared by DRW Geological Consultants Ltd., with an effective date of August 8, 2025, was used in the PEA. Details of the Mineral Resource Estimate can be found in the Report to be filed on SEDAR+ within 45 days of this release.

    Category

    Cut-off (g/t Au)

    Grade (Au, g/t)

    Tonnes

    Gold Oz

    Strip Ratio

    Inferred

    0.20

    0.58

    36,733,000

    688,000

    2.36

    • The Mineral Resource Estimate has been constrained to a preliminary optimized pit shell, using the following parameters: SG = 2.57 gm/cc based on testwork, mining costs = $3.00/tonne, mining recovery = 98%, mining dilution = 2%, process cost = $5.00 per tonne, G&A = $1.05 per tonne, gold price = $2,500 per troy ounce, throughput at 10,000 tpd., discount rate = 5%. A cost of $0.03 was added per bench to the mining cost below the existing level surface.
    • A top cut of 32 gpt gold is applied to all zones except Zone 6 which has a top cut of 50 gpt gold.
    • Mineral Resources have been calculated using the Inverse Distance Squared method.
    • Mineral Resources constrained to optimized pit shells are not Mineral Reserves and do not have demonstrated economic viability.
    • Conforms to NI 43-101, Companion Policy 43-101CP, and the CIM Definition Standards for Mineral Resources and Mineral Reserves. Inferred Resources have been estimated from geological evidence and limited sampling and must be treated with a lower level of confidence than Measured and Indicated Resources.
    • All numbers are rounded. Overall numbers may not be exact due to rounding.
    • There are no known legal, political, environmental, or other risks that could materially affect the potential development of the mineral resources.

    MINE PLAN

    The mine plan is conceived as a conventional open pit tuck and shovel/loader operation. There are two independent pits which are developed with five-phase or pushback designs. Pit shells were designed using 6.0-meter benches with a catch bench installed every 18 meters. A bench face angle of 66° was used, resulting in an inner-ramp angle of 45° when catch benches were included. An 88% overall gold recovery has been used in this study, which was based on bottle roll and column leach test results. Base case haulage ramps are 26 meters wide and have a design gradient of 10%. Processing rates are based on a daily crushing rate of approximately 10,000 tonnes per day utilizing two stage crushing

    The mine and crushing will be operated by contractors with oversight by GMV mine management. The mine plan produces a nominal tonnage to the crushing and heap leach of 3,500 Ktonnes per year (10,000 tpd) from a total material movement of 93.8 Ktonnes for the life of mine (26,106 tpd LOM average).

    The PEA is preliminary in nature; it includes inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that the PEA will be realized. There is no Mineral Reserve at the Mexican Hat Project at this time. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Over the course of the mine life, 38.6 Mtonnes of Mineralized Resource is planned for processing out of a total material movement of 117.8 Mtonnes.

    INFRASTRUCTURE & PROCESS PLANT

    The Mexican Hat Project is located in the southeastern part of the State of Arizona, approximately 72 miles east-southeast of Tucson, and can be accessed from the Old Ghost Town Road., a gravel road extending south of the Town of Pearce or north from Gleeson Road.

    Groundwater will be used as the source of water for mining operations. No permitting restrictions or quantity issues are anticipated.

    A 69 kV powerline to site will be supplied by Sulphur Springs Valley Electric Cooperative from their power plant located 30 km north of the project site.

    The crushing plant will be operated by a contractor to produce a crushed product for heap leaching with a 25 mm top size. Pregnant solution from the heap leach will be processed in a conventional adsorption desorption recovery (ADR) plant. The process plant will produce doré gold bars.

    TECHNICAL REPORT AND QUALIFIED PERSONS

    The Report entitled Updated Preliminary Economic Assessment, Mexican Hat Project’, with an effective date of August 8, 2025 and which was prepared by the following Qualified Persons (as defined under NI 43-101), all of whom are independent of the Company, will be filed by the Company within 45 days of this release on www.sedarplus.com:

    • Mr. Brian Olson, Q.P., Samuel Engineering, Inc. (Metallurgical Test Work and Recovery, Process Plant and Process Operating Costs)
    • Mr. Steven Pozder, P.E., Samuel Engineering, Inc. (Project Economics and Infrastructure)
    • Dr. Dave Webb, Ph.D., P.Eng., P.Geo., DRW Geological Consultants Ltd. (Mineral Resource Estimate, Property Description and Location, Accessibility, Climate, Local Resource, Infrastructure and Physiography, History, Geological Setting and Mineralization, Deposit Types, Exploration, Drilling, Sample Preparation, Analysis and Security, Data Verification).
    • Mr. Thomas L. Dyer, P.E., RESPEC LLC. (Mine Design, Production Schedule, Capital and Operating Costs)
    • Mr. Francisco J. Barrios, P.E., BBA Consultants International LP (Pad Design and Loading)
    • Ms. Dawn Garcia, CPG, PG, Stantec Consulting Services Inc. (Environmental)

    All Qualified Persons have contributed to their corresponding sections in Interpretation, and Recommendations. The Qualified Persons have reviewed and approved the scientific, technical, and economic information obtained in this news release.

    For a description of the data verification process and limitations, underlying assumptions and the results of surveys and quality assurance program regarding exploration information, please refer to the Company’s existing NI 43-101 Technical Report filed on SEDAR+ entitled ‘Preliminary Economic Assessment, Mexican Hat Project’ with an effective date of October 20, 2020.

    Ian Klassen, President & CEO remarked that ‘The robust PEA confirms our contention that the project’s strong economic potential de-risks the development pathway, providing a solid foundation for advancement. The results validate the open-pit, heap-leach concept, demonstrate excellent metallurgy and recoveries, and outline a simple mining and processing strategy. With high margins, rapid payback, and straightforward engineering, the PEA positions the project well for the future, where detailed design, capital optimization, and permitting can advance with confidence.’

    2025-2026 Forward Looking Plan

    The Mexican Hat Project PEA economics justify continued investment in project development. The forward-looking plan for Mexican Hat includes work required to advance the project through Feasibility Study and into the permitting process.

    These tasks include:

    • Approx. 7000 meters of in-fill drilling to increase confidence in the current geological understanding and mineral resource estimation to sufficient level to support mineral reserve development
    • Metallurgical column, hardness, and grinding tests to further optimize and improve heap leach gold recovery, and to provide information for feasibility design work
    • Performing a trade-off study for self-mining and crushing versus contract mining and crushing
    • Geotechnical drilling and analysis to optimize pit slope design parameters
    • Conduct base-line water sampling, and update of hydrologic, cultural, and environmental studies for permitting

    About GMV Minerals Inc.

    GMV Minerals Inc. is a publicly traded exploration company focused on developing precious metal assets in Arizona. GMV, through its 100% owned subsidiary, has a 100% interest in a Mining Property Lease commonly referred to as the Mexican Hat Project, located in Cochise County, Arizona, USA. The project was initially explored by Placer Dome (USA) in the late 1980’s to early 1990’s. GMV is focused on developing the asset and realizing the full mineral potential of the property through near term gold production.

    PEA Information and Cautionary Note Regarding Inferred Mineral Resources

    The mine plan evaluated in the PEA is preliminary in nature and includes Inferred Mineral Resources, as defined by NI 43-101 that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be converted to Mineral Reserves. Additional drilling and technical studies will need to be completed in order to fully assess its viability. There is no certainty that a production decision will be made to develop the Mexican Hat Project or that the economic results described in the PEA will be realized. Mine design and mining schedules, metallurgical flow sheets and process plant designs will require additional detailed work and economic analysis and internal studies to ensure satisfactory operational conditions and decisions regarding future targeted production.

    Cautionary Note to U.S. Investors

    The United States Securities and Exchange Commission permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We use certain terms in this report, such as ‘measured,’ ‘indicated,’ ‘inferred,’ and ‘resources,’ that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC.

    Cautionary Statement Regarding Forward-Looking Information

    This news release includes certain ‘forward-looking information’ under applicable Canadian securities legislation. Forward-looking information include estimates and statements that describe the Company’s future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking information may be identified by such terms as ‘believes’, ‘anticipates’, ‘expects’, ‘estimates’, ‘may’, ‘could’, ‘would’, ‘will’, or ‘plan’. Forward-looking information contained in this news release include, but are not limited to, statements or information with respect to: the results of the PEA, including the IRR and NPV, life of mine and production, capital and operating expenditures, cost estimates; permitting restrictions, and the mine plan, including infrastructure requirements and future plans; the filing of the PEA, including timing thereof, mineral resources; and future gold prices. Since forward-looking information are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties as described in the Company’s filings with Canadian securities regulators. Assumptions upon which forward-looking information contained in this news release is based, without limitation, include: results of future exploration; gold prices; accuracy of the results of the PEA, including key assumptions and methods used to determine mineral resources and the results of the PEA; the ability to obtain required permits and approvals; the ability to execute future plans; exchange rates; ability to obtain funding; and changes in regulatory or community environment; Risks, and uncertainties include: results of further exploration; risks related to mineral tenure, permits and approvals; risks related to the execution of future plans; changes in gold price and exchange rates; risks related to obtaining financing; foreign country risks; regulatory risks and liabilities; and those risks and uncertainties as further described in the Company’s filings with Canadian securities regulators which can be found on SEDAR+ at www.sedarplus.ca under the Company’s profile. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

    Dr. D.R. Webb, Ph.D., P.Geo., P.Eng. is the Q.P. responsible for this release within the meaning of NI 43-101 and has reviewed the technical content of this release and has approved its content.

    ON BEHALF OF THE BOARD OF DIRECTORS

    Ian Klassen, President
    For further information please contact:
    GMV Minerals Inc.
    Ian Klassen
    Tel: (604) 899-0106
    Email: info@gmvminerals.com

    Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

    Source

    Click here to connect with GMV Minerals Inc. (TSXV:GMV)(OTCQB:GMVMF) to receive an Investor Presentation

    This post appeared first on investingnews.com

    (TheNewswire)

    Crown Porphyry-Stockwork Drill Targets Confirmed

    Vancouver, British Columbia, January 7th, 2026 TheNewswire Prismo Metals Inc. (‘Prismo’ or the ‘Company’) (CSE: PRIZ,OTC:PMOMF) (OTCQB: PMOMF) is pleased to announce it has received final assay results for samples taken at the Silver King Project from the Crown porphyry target area located on the east side of the property (Fig. 1).


    Click Image To View Full Size

    Figure 1.  Map showing the location of the Crown porphyry and stockwork and Black Diamond replacement exploration targets at the Silver King project.  Claim boundaries are shown in yellow.

    Overlimit silver assays have been received for the samples taken in late 2025, showing high grade silver mineralization associated with quartz-sulfide veins hosted by the Crown porphyry (Fig 2, Table 1). These assays provide evidence for a high-priority drill target, especially when taken in conjunction with the high gold assays reported previously for the stockwork intrusion (see the News Release of Dec. 3, 2025).  

    ‘Prismo optioned Silver King with existing drill targets around the historically significant high-grade silver mine. Based on the geology and its location in a well mineralized region, we believed that additional mineralization was also likely present. Our work in the second half of 2025 indicates that we were correct, and we now have exceptional drill targets at the Crown porphyry and adjacent Black Diamond replacement areas,’ stated Craig Gibson, Chief Exploration Officer of the Company. He added, ‘With the high-grade gold assays reported in December and the copper assays at the Black Diamond replacement, we now have a very significant precious-metal and copper target at Silver King similar to other areas in this well mineralized district that includes the Magma mine and the Resolution copper deposit.’  

    ‘These additional assay results along with the IP survey information continue to enhance and support our exploration thesis of the Silver King mine and surrounding areas,’ stated Gordon Aldcorn.  ‘This modern-day review has yielded additional drill targets and prospective structures to our program in this already very strategically located project.’

     

    Table 1. Assay results for selected samples from the Crown porphyry stockwork

    Sample

    Location

    Easting

    Northing

    Width m

    Au g/t

    Ag g/t

    Cu %

    Pb %

    Zn %

    544559

    Crown porphyry

    492681

    3687905

    0.5 m

    0.02

    18.91

    0.02

    0.07

    0.04

    544561

    Crown porphyry

    492673

    3687904

    2 m

    0.02

    177

    0.07

    0.37

    0.02

    544563

    Crown porphyry

    492613

    3687848

    0.5m

    0.03

    176

    0.09

    0.01

    544591*

    Crown porphyry

    492799

    3687851

    1.0

    5.19

    46.44

    0.05

    0.21

    0.06

    544592*

    Crown porphyry

    492793

    3687823

    1.0

    4.06

    13.97

    0.02

    0.10

    0.07

    *Assays previously released in News Release of December 3, 2025.


    Click Image To View Full Size

    Figure 2. Precious metal and copper assays from the Crown porphyry
    and the Black Diamond replacement body at the Silver King Project.

    IP Survey

    The Company also completed a pole-dipole IP survey over a part of the Silver King project in December 2025.  This survey was designed to provide some additional 3-dimensional data for areas identified during the initial gradient array survey (see News Release dated December 3, 2025). This new survey confirmed the presence of important chargeability and resistivity anomalies at the Silver King project. The Silver King silver mine appears to be associated with a large low resistivity anomaly located on the contact of the Silver King diorite porphyry (Fig 3). There is also low resistivity anomalies associated with the Crown porphyry and near the replacement mineralization at Black Diamond (Fig 3). The highest chargeability anomalies appear to be associated with the altered country rocks along intrusive contacts, but a chargeability high is also associated with the Crown porphyry stockwork intrusion. The anomaly associated with the Crown porphyry is particularly interesting and can be traced from shallow levels to about 300 meters in depth.  


    Click Image To View Full Size

    Figure 3. IP resistivity map at a depth of 75 meters, overlain on geology and showing the Silver King glory hole (black line), Black Diamond replacement body in red, and the Crown porphyry-stockwork in magenta.  


    Click Image To View Full Size

    Figure 4. IP chargeability at a depth of 75 meters, overlain on geology and showing the Silver King glory hole (black line), Black Diamond replacement body in red, and the Crown porphyry-stockwork in magenta.  

    Drilling Update

    Alain Lambert, CEO of Prismo commented: ‘The results announced today confirm the vast exploration potential at Silver King. While we look forward to drilling these new targets in the future, our plans remain unchanged. Our immediate priority is to undertake our fully funded drill program, as previously announced. This drill campaign will primarily focus on the historic Silver King mine site and will be about 2,000 meters. The objective is to test the upper half of the steeply dipping pipelike Silver King mineralized body as well as potential mineralization adjacent to the dense stockwork that was the focus of historic mining.’

    Mr. Lambert added: ‘We are pleased with the steady progress on the permitting front. The collaboration of Forest Service officials demonstrates a clear commitment to supporting mining activities in Arizona.’

    Prismo recently announced that the Forest Service, the federal surface land management entity for Silver King, had determined that the Company’s proposed drill plan meets the regulatory requirements for processing, and that such plan is complete, as described in the regulations at 36 CFR 228.4(c).

    The Forest Service is currently proceeding with the environmental analysis pursuant to 36 CFR 228(a)(5) in conformity with the National Environmental Policy Act (NEPA). This analysis is proceeding as a Categorical Exclusion, the lowest level of environment reviews applicable to projects that are not expected to have a significant effect on the environment, such as Silver King.

    QA/QC

    Samples were analyzed by SGS, an internationally recognized analytical lab, with preparation at the Tempe, Arizona facility and analyses at the Burnaby laboratory.  Prismo inserts controls samples consisting of a standard pulps and a coarse blanks in the sample stream, and the lab also inserts control samples.  

    Qualified Person

    Dr. Craig Gibson, PhD., CPG., a Qualified Person as defined by NI-43-01 regulations and Chief Exploration Officer and a director of the Company, has reviewed and approved the technical disclosures in this news release.  

    About Prismo Metals Inc.

    Prismo (CSE: PRIZ,OTC:PMOMF) is a mining exploration company focused on advancing its Silver King, Ripsey and Hot Breccia projects in Arizona and its Palos Verdes silver project in Mexico.

    Please follow @PrismoMetals on Twitter, Facebook, LinkedIn, Instagram, and YouTube

    Prismo Metals Inc.

    1100 – 1111 Melville St., Vancouver, British Columbia V6E 3V6 Phone: (416) 361-0737

     

    Contact:

    Alain Lambert, Chief Executive Officer alain.lambert@prismometals.com

    Gordon Aldcorn, President gordon.aldcorn@prismometals.com

      

    Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

     

    Cautionary Note Regarding Forward-Looking Information

    This release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as intends’ or anticipates’, or variations of such words and phrases or statements that certain actions, events or results may’, could’, should’, would’ or occur’. This information and these statements, referred to herein as ‘forward-looking statements’, are not historical facts, are made as of the date of this news release and include without limitation, statements regarding discussions of future plans, estimates and forecasts and statements as to management’s expectations and intentions with respect to, among other things: the timing, costs and results of drilling at Silver King; and the intended use of any proceeds raised under recent financings.

    These forward-looking statements involve numerous risks and uncertainties, and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things: the potential inability of the Company to utilize the anticipated proceeds of the Private Placement as anticipated; and those risks set out in the Company’s public disclosure record on SEDAR+ (www.sedarplus.com) under the Company’s issuer profile.

    In making the forward-looking statements in this news release, the Company has applied several material assumptions, including without limitation, that the Company will use the proceeds of the Second Tranche as currently anticipated and on the timeline currently expected.

    Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward- looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward- looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial outlook that are incorporated by reference herein, except in accordance with applicable securities laws. We seek safe harbor.

    Copyright (c) 2026 TheNewswire – All rights reserved.

    News Provided by TheNewsWire via QuoteMedia

    This post appeared first on investingnews.com

    Graphite prices have experienced volatility recently due to bottlenecks in demand for electric vehicles.

    One major factor experts are watching right now is the trade war between China and the US.

    China introduced export restrictions on certain graphite products on December 1, 2023, making it a requirement for Chinese exporters to apply for special permits to ship the material to global markets. In July 2024, the Trump administration in the US announced it would raise tariffs on battery-grade graphite imports from China to 93.5 percent.

    Another trend shaping the graphite market in 2025 has been increasing substitution of natural graphite with synthetic in battery anode production; this comes in response to Chinese exports restrictions and US tariffs on natural graphite.

    This has led to much lower prices for natural graphite, and against that backdrop, many Canadian graphite stocks have trended down. However, several graphite-focused companies have seen strong performances this year.

    Below is a look at the year’s best-performing graphite stocks on the TSXV and CSE; TSX companies were considered, but none made the cut this time. Data was obtained on July 29, 2025, using TradingView’s stock screener, and all companies listed had market caps above C$10 million at that time. Read on to learn more about their work this year.

    1. HydroGraph Clean Power (CSE:HG)

    Year-to-date gain: 384.21 percent
    Market cap: C$282.81 million
    Share price: C$0.99

    HydroGraph Clean Power produces cost-effective, high-purity graphene, hydrogen and other strategic nanomaterials.

    Graphene, a pure carbon material extracted from graphite, has myriad potential applications in industries such as transport, solar cells, medicine, electronics, energy, defense and desalination. HydroGraph has an exclusive license from Kansas State University to produce graphene and hydrogen through the organization’s patented detonation process.

    Much of HydroGraph’s news flow in 2025 has centered on strategic partnerships.

    Results from a research study conducted with Arizona State University were released in January, demonstrating that the company’s HydroGraph’s Fractal Graphene is well suited for ultra-high-performance concretes and 3D-printed structures. In February, HydroGraph announced a technical collaboration with an unnamed global leader in synthetic fiber manufacturing to assess the potential of its graphene technology in high-performance fiber applications.

    The following month, HydroGraph shared the launch of a line of advanced graphene dispersions developed in collaboration with battery materials and testing services company NEI. The products have the potential to be used to produce high-performance electrodes for use in energy storage solutions.

    The company signed a letter of intent in April that could lead to a leading North American industrial gas supplier providing it with access to large volumes of high-purity acetylene. This is an essential material in HydroGraph’s patented detonation synthesis process. Acquiring this feedstock will help the firm advance its plans to build a new graphene production facility in Texas with the capacity to produce over 350 metric tons of graphene annually.

    HydroGraph launched its Compounding Partner Program in July with the goal of attaining commercial-scale production of its high-performance Fractal Graphene in thermoplastics. According to the company, initial certified partners are testing new formulations in the automotive and packaging sectors.

    After trading in a range of C$0.22 to C$0.35 for much of the year, shares of HydroGraph jumped nearly 300 percent in a matter of days to reach a year-to-date high of C$0.99 on July 29.

    2. Black Swan Graphene (TSXV:SWAN)

    Year-to-date gain: 107.35 percent
    Market cap: C$60.02 million
    Share price: C$1.41

    Black Swan Graphene describes itself as an emerging powerhouse in the bulk graphene business.

    The company is a spinout of Mason Resources (TSXV:LLG,OTCQX:MGPHF), which owns the Uatnan graphite project in Québec and holds a 39 percent stake in Black Swan. Graphite from Uatnan is used to supply Black Swan.

    UK-based global chemicals manufacturer Thomas Swan & Co. holds a 15 percent interest in Black Swan, and brings a portfolio of patents and intellectual property related to graphene production. Through this partnership, Black Swan is building out a fully integrated supply chain of mine-to-graphene products.

    Black Swan’s share price traded sideways for much of the year before benefiting greatly from a summer surge. Shares of Black Swan reached their highest year-to-date price of C$1.52 on July 23.

    This followed a series of positive news items concerning progress on increasing commercial output. On June 3, Black Swan announced the installation of an additional production unit at its operational facility in the UK. It is working to more than triple its annual production capacity from 40 metric tons of high-quality graphene to 140 metric tons.

    Later in the month, the company signed a non-exclusive distribution and sales agreement with Indian specialty materials and polymers supplier METCO Resources. The agreement will allow METCO to “distribute and promote Black Swan’s graphene nanoplatelets and GEM advanced masterbatch products to customers across India’s industrial, packaging, automotive, and construction sectors,” as per a press release.

    Black Swan made another key announcement in the following month. On July 9, the market learned the company had secured a US patent for its breakthrough continuous graphene production process.

    3. Focus Graphite Advanced Materials (TSXV:FMS)

    Year-to-date gain: 100 percent
    Market cap: C$12.26 million
    Share price: C$0.135

    Focus Graphite Advanced Materials is both a graphite miner and a battery technology company. Its wholly owned flagship Lac Knife high-grade crystalline flake graphite project is located in Northeastern Québec.

    With a completed feasibility study, Lac Knife is one of North America’s most advanced graphite deposits. The company also holds Lac Tétépisca, the highest-purity graphite project in Québec.

    In terms of battery technologies, Focus Graphite has a patent-pending proprietary silicone-enhanced spheroidized graphite technology that is designed to enhance battery performance and efficiency.

    In late May, definition drilling at Lac Tétépisca led to an extension of the strike length of the mineralized zone to over 6 kilometers, while preliminary metallurgical testing confirmed the quality of the project’s flake graphite.

    In mid-June, the company said thermal purification testing on Lac Knife flake graphite completed by American Energy Technologies Company had resulted in refined concentrate to a purity level of 99.999 percent carbon.

    “This milestone underscores Focus Graphite’s potential to supply ultra-high-purity graphite material for nuclear energy applications, a market historically dominated by synthetic graphite and limited to a small cohort of qualifying producers,” states the company’s press release.

    Shares of Focus Graphite hit their highest year-to-date value of C$0.17 on June 17.

    Securities Disclosure: I, Melissa Pistilli, hold no direct investment interest in any company mentioned in this article.

    This post appeared first on investingnews.com